Section-20, Installing the rails for the upper CEC enclosure (XC1)

About this task

Procedure

  1. Locate the CEC enclosure rail set (P/N xxxxxxx) in Box 6 of 10.
  2. Install the rails directly above the lower CEC enclosure.