(D2xxxxxx) Partition status progress codes

D2xxxxxx SRCs are posted by the Virtual Service Processor (VSP) when powering down a partition.

For use by service providers.
Table 1. (D2xxxxxx) Partition status progress codes
Progress code Description/Action

(Perform all actions before exchanging failing items)

Failing items
D200A100 Received MSD SP attention.  
D200A110 Received CPM SP attention.  
D200A120 Received LL SP attention.  
D200A130 Received RPA end-of-life event.  
D200A200 Begin partition power down. SRC word 3 contains the reason for the power off.
SRC word 3 power-down reasons
  • 1: White button power down (also known as delayed power off).
  • 2: Partition requested power down.
  • 3: Partition requested end of life.
  • 4: System wide shutdown.
  • 5: Attention link loader.
  • 6: Attention MSD.
  • 7: Panel function 3 requested.
  • 8: Panel function 8 requested.
  • 9: Panel function 22 requested.
  • A: Panel function 34 requested.
 
D200B050 Begin transfer slot locks to VSP.  
D200B05F End transfer slot locks to VSP.  
D200B060 Begin transfer VIO slot locks to VSP.  
D200B06F End transfer VIO slot locks to VSP.  
D200B070 Begin reset slots.  
D200B077 Waiting for reset slots.  
D200B07F End reset slots.  
D200B080 Begin reset VIO slots.  
D200B08F End reset VIO slots.  
D200B090 Begin soft POR slots.  
D200B097 Waiting soft POR slots.  
D200B09F End soft POR slots.  
D200B100 Sending Hypervisor reset.  
D200B1FF Hypervisor reset successfully sent.  
D200B200 Begin forced LP reset (after the 1 second timeout).  
D200B210 Send CSP/FSP soft processor reset command (word 3 processor ID, word 4 thread ID).  
D200B2FF End forced LP reset.  
D200B300 Closing Hypervisor events paths.  
D200B310 Deactivating panel functions.  
D200B3FF Hypervisor reset complete successfully.  
D200C100 Sending Hypervisor I/O reset.  
D200C1FF Hypervisor I/O reset sent successfully.  
D200C200 Deallocating events.  
D200C2FF Hypervisor I/O reset complete successfully.  
D200D100 Removing partition configuration resources.  
D200D1FF Partition resources removed successfully.  
D200E050 Begin power off slots.  
D200E057 Waiting power off slots.  
D200E05F End power off slots.  
D200E060 Begin power off VIO slots.  
D200E06F End power off VIO slots.  
D200E080 Begin release slot locks.  
D200E08F End release slot locks.  
D200E090 Begin release VIO slot locks.  
D200E09F End release VIO slot locks.  
D200E0A0 Begin disassociationof serial ports.  
D200E0A8 Disassociate serial ports from an RPA partition.  
D200E0AF End disassociation of serial ports.  
D200E100 Power off SPCN racks.  
D200E110 Issuing a rack power off command.  
D200E120 Rack power off command complete successfully.  
D200E1FF SPCN racks powered off phase complete.