Installing and testing the Rack-5 storage enclosures
You are here to install one or more pairs of storage enclosures in Rack-5.
Procedure
-
Begin the installation of the Rack-5 storage enclosures at the HMC.
- From the navigation area, click Storage Facility Management > storage facility.
- From the bottom Task area, click MES Install/Remove > Install Storage Enclosure or Drives. For earlier versions, the menu item is Install Storage Enclosure or DDMs.
- The Install window opens and asks if you were sent from the installation or MES instructions. Click Yes.
- The Single Choice Message Box window opens and prompts "Select the component or enclosure you would like to install." Select Install Storage Enclosures and then click Submit.
-
Another Single Choice Message Box window opens and prompts
Select the component you would like to install.
Select Install FC-AL Storage Enclosures and then click Submit. -
Another Single Choice Message Box window opens and prompts
Select the Storage Facility Image you want to assign the storage enclosures to.
Select the storage facility image that is shown and then click Submit. -
The cabling configuration window opens. Confirm that the window indicates cabling
configuration is for the correct storage facility model, then click
Yes.
Note:
- If the window does not show the correct model, confirm that you are using the correct section of these instructions, or contact your next level of support.
- For example, storage enclosures in a model 85E expansion rack cannot be installed on systems configured for models 984, 84E cabling.
-
Storage enclosures on multiple DA pairs can be installed at the same time. Complete the
following steps:
- If the informational DaPairsPanel displays, click OK.
- The Select Device Adapter Pair window displays a list of DA pairs available for more storage enclosures on the selected storage facility image.
- At the rear of Rack-5, find all the storage enclosures that are not yet cabled and installed.
-
Use Figure 1 (Models 985, 85E) or
Figure 2 (Models 986, 86E) to
determine their Rack-5 storage enclosure location codes (for example: R5-G11).
Figure 1. Rack 1-5 storage enclosure and I/O enclosure location codes (single-phase Models 985, 85E) (rear view) Note: High-performance flash enclosures are in Rack-1 and Rack-2.
Figure 2. Rack 1-5 storage enclosure and I/O enclosure location codes (three-phase Models 986, 86E) (rear view) Note: High-performance flash enclosures are in Rack-1 and Rack-2.
-
Determine the DA Pair IDs that the storage enclosures connect to. Use Table 1 and Figure 1 for Models 985, 85E. Use Table 2 and Figure 2 for Models 986, 86E.
Table 1. Rack-5 storage enclosure pairs and DA pair IDs (single-phase Models 985, 85E) If Rack-5 storage enclosure: And Rack-5 storage enclosure: They connect to DA pair ID: R5-G07 has drives R5-G08 has drives 6 (in Rack-2) R5-G09 has drives R5-G10 has drives 2 (in Rack-1) R5-G11 has drives R5-G12 has drives 5 (in Rack-2) R5-G13 has drives R5-G14 has drives 7 (in Rack-2) R5-G15 has drives R5-G16 has drives 4 (in Rack-2) R5-G17 has drives R5-G18 has drives 6 (in Rack-2) Table 2. Rack-5 storage enclosure pairs and DA pair IDs (three-phase Models 986, 86E) If Rack-5 storage enclosure: And Rack-5 storage enclosure: They connect to DA Pair ID: R5-G01 has drives R5-G02 has drives 5 (in Rack-2) R5-G03 has drives R5-G04 has drives 7 (in Rack-2) R5-G05 has drives R5-G06 has drives 4 (in Rack-2) R5-G07 has drives R5-G08 has drives 6 (in Rack-2) R5-G09 has drives R5-G10 has drives 1 (in Rack-1) R5-G11 has drives R5-G12 has drives 3 (in Rack-1) R5-G13 has drives R5-G14 has drives 0 (in Rack-1) R5-G15 has drives R5-G16 has drives 2 (in Rack-1) - At the HMC screen, select all the DA Pair IDs that will have storage enclosures installed and click OK.
- The Select Storage Enclosure Pairs window displays the status of the storage enclosure positions available for installation for each DA pair ID.
- Multi-select
each storage enclosure position you will install. Each of those positions
should display the enclosure status
Available for Install
. Then click OK.Note: If a position to be installed does not displayAvailable for Install,
it may already be installed. If it is not already installed, stop and contact next level of support. - An Action Panel window displays the physical location codes of the storage enclosures to be connected. If the location codes are correct, click OK.
- Wait for the TextandNextButtonBean window to display.
- The HMC displays the Rack-4 storage enclosure physical location codes to be installed for each DA pair ID.
- DO NOT click Next until directed in a later step.
- Using the HMC-displayed physical location code, refer to Figure 1 (for Models 985, 85E) or Figure 2 (for Models 986, 86E) to determine the location of each storage enclosure being installed in the rack.
- Go to the next step.
-
For each Rack-5 storage enclosure physical location code that is displayed by the HMC, ensure
that the four FC-AL cables are still connected to the T1 & T2 connectors on both FCICs in the
Rack-5 storage enclosure that is being installed. The connectors are labeled J1 & J2 on the
sheet metal. See Figure 3.
Attention: Ensure each FC-AL cable is connected to the correct enclosure and port. Incorrect connections during this installation could result in a loss of access when additional storage is added to the affected DA pair.Note: Do not disconnect these cable ends as part of this installation procedure.
Figure 3. Storage enclosure connectors location codes
-
For each Rack-5 physical location code that is displayed by the HMC, find the location code in
the first column of the appropriate tables.
Use Table 3 or Table 4 for single-phase Models 985, 85E.
Use Table 5 for three-phase Models 986, 86E.
Then, use the information in the second and third columns to connect the FC-AL cable to the FCIC card.Attention: Ensure each FC-AL cable is connected to the correct enclosure and port. Incorrect connections during this installation could result in a loss of access when additional storage is added to the affected DA pair.Table 3. FC-AL cable connections for Rack-5 storage enclosures to Rack-4 storage enclosures (single-phase Models 985, 85E) Rack-5 storage enclosure location code that is displayed on HMC: Rack-4 physical location to connect the four FC-AL cables to Rack-4: Storage enclosure Connector R5-G09 R4-G07 T3 & T4 on both FCIC cards R5-G10 R4-G08 R5-G11 R4-G09 R5-G12 R4-G10 R5-G13 R4-G11 R5-G14 R4-G12 R5-G15 R4-G13 R5-G16 R4-G14 R5-G17 R4-G15 R5-G18 R4-G16 Table 4. FC-AL cable connections: Rack-5 storage enclosures to Rack-5 storage enclosures (single-phase Models 985, 85E) Rack-5 storage enclosure location code that is displayed on HMC: Rack-5 physical location to connect the four FC-AL cables to Rack-5: Storage enclosure Connector R5-G07 R5-G17 T3 & T4 on both FCIC cards R5-G08 R5-G18 Table 5. FC-AL cable connections: Rack-5 storage enclosures to Rack-4 storage enclosures (three-phase Models 986, 86E) Rack-5 storage enclosure location code that is displayed on HMC: Rack-4 physical location to connect the four FC-AL cables to Rack-4: Storage enclosure Connector R5-G01 R4-G01 T3 & T4 on both FCIC cards R5-G02 R4-G02 R5-G03 R4-G03 R5-G04 R4-G04 R5-G05 R4-G05 R5-G06 R4-G06 R5-G07 R4-G07 R5-G08 R4-G08 R5-G09 R4-G09 R5-G10 R4-G10 R5-G11 R4-G11 R5-G12 R4-G12 R5-G13 R4-G13 R5-G14 R4-G14 R5-G15 R4-G15 R5-G16 R4-G16 - You already selected all the storage enclosures to be installed at one time. Return to the HMC and click Next.
- The
HMC automatically initializes the storage facility image the storage
enclosures are being installed to. Note: The times that are listed are for a fully populated rack.
The HMC displays some or all of the following messages:
Task in Progress...Powering on the FRU(s)
Task in Progress... Verifying the FRU power-on
Verification Progress...Verification progress:
Working
Task in Progress...Activating the system (maximum of 40 minutes)
Working...
Task in Progress...Verifying system
Verification Progress...Verification progress: (maximum of 35 minutes)
Working
Task in Progress...Activating applications (maximum of 45 minutes)
Verification progress... Verifying applications
Verification progress... Verification progress:
Working
- A window might open indicating that the drives that
are involved in this service action are now being formatted in the
background. Click Next. Note: The actual drive state might be formatting, initializing, or certifying depending on the drive type and size. Monitor completion of the certify process later in this procedure, in the section
Finish installation and cleanup.
- A completion window opens that indicates:
Installation has completed successfully Return to the MES or installation instructions.Click Next.
When the HMC is finished, it displays a message:
Service action is ending...
The window closes. Go to the next step.
-
Have you installed all the FC-AL storage enclosures in Rack-5?
- Yes, to go the next step.
- No, return to step 2 to install the remaining storage enclosures.
- Display and repair any related open serviceable events.
- View the storage facility state, refer to
MAP1100 View storage facility state (end of call).
- All status fields should display as PASSED except for the following.
- If the Resources State result is
Failed
, select it and then click Details. If the Drive state is5 (Certifying)
, this is normal and you should go to the next step. - If other checks are failed, select it and then click Details. They should be fixed before going to the next step. If needed, call the next level of support.
Note: If the Large File Transfer displays as FAILED, the remaining System Check Types below it cannot be displayed. Contact the next level of support.Figure 4. Window: View Storage Facility State 
- If the Resources State result is
- All status fields should display as PASSED except for the following.
- Click Cancel to exit the View Storage Facility State window.
-
Are you installing a Rack-2 on this storage facility as part of this installation
activity?
- Yes. Go to Installing and testing the Rack-2 I/O enclosures host adapter cards.
- No. Go to Completing the installation.