MAP2530 Power repair stopped with SFI incomplete status
A repair of a rack power system serviceable event could not successfully start because the power repair process in the HMC received storage facility image (SFI) incomplete status from the power controlling SFI. The HMC power repair process uses the power controlling SFI to access the RPC cards to control and test the rack power system. In special repair cases, if the SFI is in power off state (both CEC complexes are in service processor/FSP power off state), the HMC power repair process can bypass the SFI and directly access the RPC cards to control and test the rack power system.