Exchange the I/O enclosure power supply to the power distribution unit (PDU) cable
Before you begin
Use approved ESD procedures to prevent damage.
Attention:
- This procedure is not a stand-alone procedure. Customer disruption and damage to the hardware might occur when microcode and power boundaries are not in the proper conditions for this service action.
- If a serviceable event FRU repair directed you to this procedure, the microcode and power boundaries are already set.
- If a serviceable event FRU repair did not direct you to this procedure, see MAP1230 Replace a FRU without using a serviceable event.
Notes:
- All the cables and FRUs to be removed must be uniquely identified so they can be reinstalled correctly.
- If an installed earthquake resistance kit prevents you from accessing this FRU, refer to MAP1600.
Remove the I/O enclosure power supply to the PDU cable
About this task
Note: The I/O enclosure must be fully removed from the rack
for this procedure.
Procedure
Install the I/O enclosure power supply to the PDU cable
Procedure
- Install the new power cable alongside the I/O enclosure.
- Slide the I/O enclosure back into the rack and install the two hold down screws.
- At the rear of the rack, connect all the cables to the I/O enclosure.
- At the front of the rack install the two power supplies. Ensure that the red latch beneath the input power connector is secure.
- Reinstall the I/O power supply retention bracket.
- Install and latch the two fans.
- Connect the two black power cables to the power supplies.
- Route and connect the power cables to the PDU.
- At the bus bars, slide the blue retention bracket back in position.
- Reinstall the cable retention hardware.
- Exit this service information center parts exchange procedure and return to the procedure that sent you here.
to both power supplies in the I/O
enclosure. See 
. See 


, and customer host
). Ensure that the cables are labeled so they can be properly replugged. See 